Step 1. Draw a datum line one column over the washroom floor

Measure your tile stature, and imprint a point on the washroom divider that is 20mm underneath that tallness. At that point utilize your soul level to draw a flat line, known as a "datum line", at that stature the distance around the room. The stature is lessened by 20mm just on the off chance that there is a low point in the floor that needs covering.

Step 2. Introduce a provisional timber rack on the datum line

Get a long, straight bit of timber and mount it on the washroom divider so its top edge lines up with your datum line. At that point drive a screw through the timber's center into a divider stud. Presently utilize a soul level to check the timber is even and screw the two finishes into divider studs too.

Step 3. Check your tile paste is protected to use with waterproofing

Building regulations require the dividers of your restroom to have a waterproof covering introduced. When that coating is set up, you can begin tiling. Check the data in favor of your bundle of tile paste to verify that it is sheltered to use with waterproofing

Step 4. Discover the last's width tile consecutively

To work out the last's width tile in succession, lay one tile in position on the timber rack you have introduced. At that point move it down the rack one tile-width at once, in addition to the width of a spacer, until you achieve the line's end. On the off chance that the last tile should be short, you can pre-trim one for every column before you begin tiling.

Step 5. Stir up the tile paste

Empty some tile paste powder into a basin with some water in it, then utilize a force drill with a blending oar to mix the blend together. Continue blending until the paste has the consistency of toothpaste. On the off chance that you find that it's excessively runny or dry, then adjust it out with somewhat more powder or water.

Step 6. Lay the first column of tiles

Spread some paste on the first's back tile utilizing the indented edge of your trowel. This makes trenches in the paste so the tile sticks better. At that point put the tile's base on the timber retire and level it onto the divider. Tidy up any abundance paste and push plastic wedges under the base corners of the tiles. Rehash for each tile over the column, putting spacers between every tile as you go.

Step 7. Step up the first line of tiles

Once the first line of tiles has been laid, put a soul level on top to watch that they are even. This is the place the wedges are useful. On the off chance that any of the tiles need modifying, essentially move the wedges' position to lift or drop the tiles so they line up accurately.

Step 8. Lay more columns of tiles on the restroom divider

Put enough paste on the divider to cover a few lines of tiles. By and by, utilize the indented side of your trowel to place trenches in the paste as you spread it. When you have spread the paste, work rapidly to put your tiles set up before the paste begins to cure. Lay them one line at once, utilizing plastic spacers to keep the crevices between every tile the same. In the event that you have to trim a tile before you lay it, leave that range free of paste and do that tile as a major aspect of the following step.

Step 9. Trim and lay edge and corner tiles

When you have to trim a tile before you lay it, put the tile set up on the divider, stamp you're cutting focuses and utilize a tile cutter or edge processor to trim the tile to estimate. At that point put your tile set up again to check the cut is correct, put some paste on the back and lay it in position.